Commercially viable solution for the liquefaction of smaller gas volumes typically associated with biogas. Bio-LNG can be used at source for power generation, fueling natural gas vehicles and bunkering, loaded into cryogenic containers and transported for regional use or vaporized and injected into the pipeline.
View and download our literature
Complete engineering and equipment solution that can also be supplied as a full EPC turnkey project with tailored packages for commissioning, servicing and training. Typical overall project schedule, from order to plant start-up is 18 months.
Chart’s Micro LNG plant utilizes proven, shop built standard components and mixed refrigerant cycle process technology for maximum reliability and ease of operation. Equipment packages are modularized for simplified installation and reduced time at site.
Nameplate capacity of 15,000 gallons per day (25 tons per day). Turndown capability means that the plant will operate at reduced flows, duty and capacity. Mixed refrigerant process technology. Appropriate gas pre-treatment package. Shop built, standard, modular equipment packages. All modules are supplied skid mounted for road transport and easy installation.
Standard package includes 3 days of cryogenic storage. Principal equipment engineered and built in-house. Overall plot plan required approx. 20 x 26m. Electric power source. Chart’s standard loadout is a 1 or 2 bay system with a simplified dispenser or pump skid, depending on plant size and transport frequency.